• AIR KNIFE SYSTEMS
    Superior Technology For Most Effective-Efficient-Energy
    Saving Solutions For Drying-Cleaning-Blow
    OFF -Wiping-Many more Applications.

Air Knife Application Evaluation Guide

(PLEASE FILL IN AVAILABLE INFORMATION, BALANCE CAN BE LEFT BLANK)
(*represents compulsory fields )
   
* Organization/Company Name
* Your Name
* Phone : (Include Country/Area Code)
* Your E - mail
1. Please describe your application or requirement
Drying
Cooling
Coating Drying
Debris Blow Off
Static Control
Other
Coating Control
   
2. Describe the part
Description
Dimensions
Length
Width
Height
Diameter
Temp
3. Describe the material to be removed
Tap Water
Contaminants
Acids/Caustics
D.I. Water
Dust
Coating
Coolants/ Lubricants
Wash Solution
Other
4. What are the properties of the liquid to be removed from surface
Temperature
Viscosity
It is a Solution of
5. What surfaces require drying/ cleaning
All Surface
Left Side
Nothing
Top
Other
   
6. I can provide the following upon request
Sample Part
CAD/SOLID
Digital Photo
Drawing / Sketch
Other
   
7. Conveyor Details
a. Type of conveyor
Flat Belt
Reel to Reel
Roller
Chain Mesh
Overhead
Other
Cable/ Chain
Hoist
   
b. If Roller conveyor
Dia of Roller
Width
Pitch
c. Material of Constructions
Metal
Plastic
Coating
d. Motion
Continuous
Indexed Motion
Dwell Time
e. Speed
Meter/ Min
Part/Min
Other
8. Describe the orientation of the part and direction of travel
Description 
9. What is the next process after Drying/Blow off?
Description 
10. What are you currently using for drying or blow-off ?
Description 
11. What method do you use to determine the success of the drying or blow- off?
Description 
12. What are the problem and costs associated with current method?
Quality problems
Extra Conveyor runs
Excessive labor costs
Decreased production
Excessive energy costs
Other
13. What is electrical supply available?
Volts
Hz
Phase
14. What are the plant conditions?
Altitude
Max & Min Temperature
Max & Min Humidity
15. Your Requirements?
Such Air Knife System is required for how many lines of production?
16. When Required?
When do you plan to purchase this system?

Type the number: